Wells and Reservoir Site Improvements
Client: Bayview Beach Water District
Performed design and construction phase engineering services for the construction of two 119,000-gallon concrete reservoirs, construction of a 250-gallon per minute ATEC iron and manganese treatment facility, rehabilitation of two existing ground-water wells, and installation of associated site piping.